PROJECT LIST

 

Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK

Client : Sarawak Shell Bhd
Award Date : 22nd May 2007
Completion Date : 31st October 2008
Tonnage : 1180 Matric Tonnes


The F23 Living Quarters Module and Helideck is the 2nd Offshore Living Quarters project undertaken by Brooke Dockyard for Sarawak Shell Bhd.

The contract covers the engineering, procurement, fabrication, inspection, testing & commissioning, weighing, loadout and seafastening. The contract scope also undertake the supply and fabrication of ship-loose material for offshore hook-up and commissioning (including commissioning and start-up spares) within and between the new Accommodation Module, new Helideck and existing Utilities Module.

The new accommodation Module comprises of 3 levels including roof level at EL (+) 31865 T.O.S. each floor measures approximately 13.7m x 27.2 m. This accommodation Module support equipment, facilities, a cantilevered helideck and a gymnasium at roof level. The new Helideck located above the new accommodation module.

The accommodation Module provides the necessary sleeping, messing and recreational areas for 60 persons as well as space for office, administration and associated services. The accommodation Module is installed on top of the Utilities Module includes 3 stories of accommodation, stairways, access platforms, equipment supports, handrails, the interior and exterior architectural furnishings, temporary and permanent structural framing helideck.

Project by: Oil and Gas Unit
Last updated: 12/11/2009

 

Hits: myspace counters | Copyright © by www.brookedockyard.com | empowered by eD3