PROJECT LIST

 

Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE

The Jerneh B project was the first project undertaken by Brooke Dockyard for ExxonMobil Exploration and Production Malaysia Inc (EMEPMI).

The Jerneh-B Platform was a satellite gas field development of which a tripod jacket substructure and integrated deck topside located at offshore Terengganu. Overall tonnage weight for the fabrication work was around 1,130 metric tonnes. The construction work for Jerneh-B Topsides and substructure started on March 2006 and was successfully completed and loaded out on the 31st October 2007.
Brooke dockyard as part of the contract scope will also undertook the associated host tie in and offshore hook-up and commissioning work.

The successful completion of the Jerneh-B packages is a culminated of nine months work duration with 457,335 man-hours achieved with no lost time incident.

Project by: Oil and Gas Unit
Last updated: 12/11/2009

 

Hits: myspace counters | Copyright © by www.brookedockyard.com | empowered by eD3