Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7

CLIENT :
SARAWAK SHELL BHD / SABAH SHELL PETROLEUM CO LTD

SFJT-E Platform is an unmanned drilling and riser platform with minimum facilities. The platform comprises a 3-deck structure with 6 conductors standing on a 4-leg substructure designed for jack-up drilling. The project includes :-

Fabrication of a new satellite platform consisting of SFJT-E Substructure and Topsides

· Modifications on existing SFJT-B and SFP-A, including ship-loose items



AWARD DATE :
9 December 2005

SFJT-E Topsides & Sub-structure MCD: 22 June 2006
Sail away: 29 June 2006

SFJT-B & SFP-A shiploose
MCD: 27 April 2006
Sail away: 29 April 2006

M3 & G7 South Prefabrication work, MCD: 01 March 2007
Sailaway: 04 March 2007

Project by: Oil and Gas Unit
Last updated: 16/06/2006

 

Hits: myspace counters | Copyright © by www.brookedockyard.com | empowered by eD3