PROJECT LIST

 

Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


42 meter Double Ended Ferry

Project Brief

The construction of the Batang Sadong (Sg. Buluh) Ferry
was awarded by Liew Fap Nien Sdn. Bhd., to Brooke
Dockyard and Engineering Works Corporation with a 10
months delivery period. The work commenced on the 15th
of July 2005 and as off 21st of September 05, the progress
is at 38.4 % ahead of by 4.38% from the planned percentage.
The man hours utilized so far for the construction works
is 38,000 without LTI (loss time injury).

The ferry is designed by Wong’s Shipbuilding Contractor
& Designer to achieve estimated 8 knots at full load powered
, powered by four Cummins KTA -19, 500 BHP at 1800 rpm.
With the overall length of 54.17 meters, beam of 12.20 meters
and depth of 2.6 meters, the ferry is able to accommodate
200 passengers and 32 cars


Award Date : 1st March 05
Completion Date : 31st December 05
Client : Liew Fap Nien Sdn. Bhd.

Project by: Marine Engineering Unit
Last updated: 12/05/2008

 

Hits: myspace counters | Copyright © by www.brookedockyard.com | empowered by eD3